Exit
Use the search bar above for Site Contents, Instruction Manuals, and Product IDs.
To Top
Case Studies

Tube-in-Tube Loading Spout Handling Road Salt

Published
June 9, 2016
Case Studies

Tube-in-Tube Loading Spout Handling Road Salt

Published
June 9, 2016
Client:
Salt mine – Northeast USA
Product Quantity:

1 Tube-in-Tube Loading Spout

Size:
Outlet Scavenger Size: 24 in | 610 mm ; Extended Travel: 21 ft | 6.4 m
Application:
Open stockpiling in a warehouse.

Features:

  • Telescoping tubes constructed from 304 stainless steel, for corrosion resistance.

Results: The tube-in-tube design was selected because it provides better flow when handling materials of varying shapes and sizes.

Join our newsletter and receive Vortex news & updates in your inbox.

Success! Thank you for subscribing.
Oops! Something went wrong while submitting the form.
Vortex Companies
Salina Vortex Corporation © Copyright 2021 - All Rights Reserved