Loading Spout extended handling cement powder
Loading Spout handling cement powder

Loading Spout Handling Cement Powder

Published: July 25, 2016

Spout Size: 14″ (355mm)

Handling: Cement Powder

Location: Cement Transload facility, Eastern US

Features: This Vortex Loading Spout was engineered with a dual axis positioner capable of 2′ (610 mm) side-to-side travel and 2′ (610 mm) front-to-back travel.

Details: With the aid of cameras and a monitor, the truck drivers utilize the dual axis positioner to move the spout and extend it directly into each loading hatch.